 |
 |
 |
|
A system configured by adding a PC-based measuring instrument
(WE7000) and a data processing PC to existing testing
equipment has successfully reduced the testing time. |
|
 |
 |
| |
 |
 |
|
Exemplified here is high-speed product testing equipment
that combines high-precision measuring instruments, PC,
and PLC. The system expedites the inspection process
while reducing labor cost. |
|
 |
 |
| |
 |
 |
|
A server provides centralized management of data collected
from high-precision measuring instruments. Failure notification
will be sent to a mobile terminal,. leading to a quick
response. |
|
 |
 |
| |
 |
 |
|
This system is a cost-effective centralized power monitoring
system based on network technologies.This system produces
energy saving by closely monitoring electricity consumption. |
|
 |
 |
| |
|
 |